IL 75 over CREEK

.06MI SW ROCKTON AVE · County 201, Illinois · Built 2010 · 2 Lanes · 2,250 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
101108400000000
Year Built
2010
Length
10.3 m (33.8 ft)
Max Span
4.8 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
2,250
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.