ILL 75 over TIMOTHY CREEK

0.3 MI E MERIDIAN RD · County 201, Illinois · Built 2007 · 2 Lanes · 2,550 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101018300000000
Year Built
2007
Length
11.9 m (39 ft)
Max Span
11.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,550
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.