US 20 E B over IL RR

.5 MI W OF ILL 251 · County 201, Illinois · Built 1960 · 2 Lanes · 32,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
101006300000000
Year Built
1960
Reconstructed
2002
Length
49.7 m (163.1 ft)
Max Span
18.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
32,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$768,000
Total Project Cost
$1,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.