FAS 1887 (UNMARKED over STREAM E CRABORCHARD

E OF CRABORCHARD · County 199, Illinois · Built 2005 · 2 Lanes · 550 vehicles/day

Overall
Good
Deck
8
Very Good
Culvert
8
Very Good

Bridge Details

Structure #
100202100000000
Year Built
2005
Length
10.7 m (35.1 ft)
Max Span
2.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
550
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.