WESTMINSTER DR over I-57

0.25 MI E WCL MARION · County 199, Illinois · Built 2023 · 2 Lanes · 2,250 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
100010400000000
Year Built
2023
Length
61.1 m (200.5 ft)
Max Span
30 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
2,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.