HERRIN ROAD over TRIB TO POND CREEK

1.0M E HERRIN · County 199, Illinois · Built 2016 · 2 Lanes · 5,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
100008100000000
Year Built
2016
Length
39.7 m (130.2 ft)
Max Span
12.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
5,700
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.