IL 53 over DES PLAINES RIVER

1.2 MI S IL 7 · County 197, Illinois · Built 1935 · 4 Lanes · 21,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
099990100000000
Year Built
1935
Reconstructed
2002
Length
120.7 m (396 ft)
Max Span
78.3 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
21,300
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,345,000
Total Project Cost
$5,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.