185TH STREET over UNION DRAINAGE DITCH

0.10MI E OF 80TH AVE · County 197, Illinois · Built 2012 · 2 Lanes · 1,850 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
099606600000000
Year Built
2012
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Width
26.2 m (86 ft)
Lanes
2
Daily Traffic
1,850
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.