South Orchard Driv over Lily Cache Creek

1.2 MI. N. OF I-55 · County 197, Illinois · Built 1996 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
099605400000000
Year Built
1996
Length
27.7 m (90.9 ft)
Max Span
6.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.