95TH STREET over DUPAGE RIVER

1.16M SE PLAIN-NAPRD · County 197, Illinois · Built 2014 · 4 Lanes · 9,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
099303500000000
Year Built
2014
Length
92.3 m (302.8 ft)
Max Span
46.6 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
9,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.