I-355 over I55 RMP TO NBI355

1.5M S OF BOUGHTON · County 197, Illinois · Built 2007 · 6 Lanes · 83,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
099301100000000
Year Built
2007
Length
37 m (121.4 ft)
Max Span
36.4 m
Width
14.6 m (47.9 ft)
Lanes
6
Daily Traffic
83,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.