7TH ST. (167TH) over I-355

4.3 MI S I-80 · County 197, Illinois · Built 2007 · 2 Lanes · 3,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
099032700000000
Year Built
2007
Length
90.8 m (297.9 ft)
Max Span
38.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,650
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.