US 30 over RR - EJ&E

0.7 M E OF US 6 · County 197, Illinois · Built 1985 · 4 Lanes · 13,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
099026400000000
Year Built
1985
Length
253.3 m (831 ft)
Max Span
24 m
Width
16.4 m (53.8 ft)
Lanes
4
Daily Traffic
13,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,614,000
Total Project Cost
$8,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.