IL 126 over LILY CACHE CREEK

2 M E OF IL 59 · County 197, Illinois · Built 1983 · 2 Lanes · 14,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
099026200000000
Year Built
1983
Length
21 m (68.9 ft)
Max Span
9.8 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
14,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$215,000
Total Project Cost
$323,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.