JOLIET RD (PEOTONE over I- 57

11.2 M S OF US 30 · County 197, Illinois · Built 1967 · 2 Lanes · 950 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
099016200000000
Year Built
1967
Length
86.5 m (283.8 ft)
Max Span
26.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$528,000
Total Project Cost
$792,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.