IL 126 over DU PAGE RIVER

W OF IL 59 · County 197, Illinois · Built 1925 · 3 Lanes · 21,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
099009900000000
Year Built
1925
Reconstructed
1991
Length
58.5 m (191.9 ft)
Max Span
14.6 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
21,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,538,000
Total Project Cost
$2,307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.