IL 1 over TRIM CREEK

4.5 M S OF IL 394 · County 197, Illinois · Built 1920 · 2 Lanes · 4,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
099007900000000
Year Built
1920
Reconstructed
1949
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
4,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$154,000
Total Project Cost
$231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.