I- 80 EB over JOLIET JNCT PED/BIKE
1 M W IL 7 · County 197, Illinois · Built 1964 · 2 Lanes · 19,350 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.508714, -88.143678
This bridge is in worse condition than 90.9% of bridges in County 197. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
I- 80 WB over JOLIET JNCT PED/BIKE
Built 1964
IL 7 over I- 80
Built 1964
IL 7 over RR - CSXT
Built 1968
BARNEY DRIVE over TRIBUTARY ROCK RUN
Built 2011
FAIRLANE DRIVE over TRIBUTARY ROCK RUN
Built 1986
REBECCA RD over TRIBUTARY ROCK RUN
Built 1986
INFANTRY DR over ROCK RUN CREEK TRIB
Built 1996
HOUBOLT AVE over ROCK RUN CREEK
Built 1970
MCDONOUGH ST over ROCK RUN CREEK
Built 1979
I- 80 EB over MIDLAND AVE
Built 1963
Bridge Details
- Structure #
- 099004800000000
- Year Built
- 1964
- Length
- 50.3 m (165 ft)
- Max Span
- 19 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 19,350
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $784,000
- Total Project Cost
- $1,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.