I- 55 EAST FRNT RD over SUNNYLAND DRAIN

1.8 M S OF US 30 · County 197, Illinois · Built 1956 · 2 Lanes · 2,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
099003200000000
Year Built
1956
Reconstructed
2005
Length
6.8 m (22.3 ft)
Max Span
6.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
2,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$59,000
Total Project Cost
$89,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.