FROG POND ROAD over CATTAIL SLOUGH

2 MI E OF FULTON · County 195, Illinois · Built 1966 · 2 Lanes · 725 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
098303000000000
Year Built
1966
Length
20.7 m (67.9 ft)
Max Span
7.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
725
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.