TR 558 over POND CREEK DRAIN DIT

3 MI SW GOLDEN GATE · County 191, Illinois · Built 2022 · 1 Lanes · 25 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
096347400000000
Year Built
2022
Length
30 m (98.4 ft)
Max Span
11.4 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
25
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.