TR 620 A over STREAM

3 MI NE MT ERIE · County 191, Illinois · Built 2009 · 2 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
2
Critical
Superstructure
2
Critical
Substructure
2
Critical

Bridge Details

Structure #
096345300000000
Year Built
2009
Length
10 m (32.8 ft)
Max Span
10 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.