FAP 821 (ILL-15) over TRIB MILLER CREEK

.6 MI W OF SIMS · County 191, Illinois · Built 1990 · 2 Lanes · 3,050 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
096200800000000
Year Built
1990
Length
9.8 m (32.2 ft)
Max Span
3.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,050
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.