SBI-15 over UNNAMED STREAM
3.5 MI W EDWARDS C L · County 191, Illinois · Built 1921 · 2 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
38.375269, -88.214964
This bridge is in worse condition than 92.1% of bridges in County 191. The average bridge in Illinois is 0 years old; this one is 105 years old.
Nearby Bridges
FAP 823 (IL 15) over STREAM
Built 2012
FAP-823 (ILL-15) over STREAM
Built 1955
CH 30 / SBI 15 over STREAM
Built 1921
FAP 823 (IL 15) over STREAM
Built 2012
FAS-2816 over WHITE OAK SLOUGH
Built 1991
FAP-823 (ILL-15) over LITTLE WABASH RIVER
Built 1923
FAS-2816 over LITTLE WABASH RIVER
Built 1956
FAP-823 (ILL-15) over WHITE OAK SLOUGH
Built 1982
FAS-2816 over UNION DRAIN DITCH
Built 1989
TR 493 over BR OF LITTLE WABASH
Built 2013
Bridge Details
- Structure #
- 096002700000000
- Year Built
- 1921
- Length
- 24.1 m (79.1 ft)
- Max Span
- 8.1 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.