TR 2 over BR. OF MUD CREEK

5 NILE N OF TILDEN · County 189, Illinois · Built 1994 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
095320600000000
Year Built
1994
Length
12.6 m (41.3 ft)
Max Span
11.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.