FAP-825 (ILL-15) over BONPAS CREEK
3.5 MI W BELLMONT · County 185, Illinois · Built 1958 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.386342, -87.976194
This bridge is in worse condition than 80% of bridges in County 185. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
SBI 1E (BROWNS RD) over BONPAS CREEK
Built 2007
SBI-1 (BROWNS RD) over STREAM
Built 1922
FAP-825 (ILL-15) over STREAM
Built 1969
TR-4 over TRIB BONPAS CREEK
Built 1990
TR-175 (EDWARDS CO over BONPAS CREEK
Built 1986
TR 4 over DRAINAGE DITCH
Built 2001
TR-136A over INDIAN CREEK
Built 1977
FAP-825 (ILL-15) over STREAM
Built 1979
TR-173 over CREEK
Built 1997
TR-137 (EDWARDS CO over BONPAS CREEK
Built 1981
Bridge Details
- Structure #
- 093000900000000
- Year Built
- 1958
- Reconstructed
- 2000
- Length
- 114.6 m (376 ft)
- Max Span
- 31.7 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,647,000
- Total Project Cost
- $1,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.