TR 1 over STREAM

2 MI NW RANKIN · County 183, Illinois · Built 1920 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

40.486047, -87.921506

This bridge is in worse condition than 79.8% of bridges in County 183. The average bridge in Illinois is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
092327600000000
Year Built
1920
Length
10 m (32.8 ft)
Max Span
9.5 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Other
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.