ILL 119(FAP 711) over N FORK VERMILION RIV
2 MI E OF IL 1 · County 183, Illinois · Built 2013 · 2 Lanes · 1,350 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.300036, -87.618733
This bridge is in worse condition than 24.7% of bridges in County 183. The average bridge in Illinois is 0 years old; this one is 13 years old.
Nearby Bridges
TR 101 over N FK VERMILION RIVER
Built 2003
CH 3 over STREAM
Built 1935
TR 344 over PAINTER CREEK
Built 1994
CH3 over STREAM
Built 2003
TR 83 over EAST BRANCH
Built 1959
FAP 332(IL 1) over STREAM
Built 1993
TR 125 over UNNAMED DITCH
Built 2003
TR 392 over PAINTER CREEK
Built 1987
TR 334 over MDL BR N FK VERM RIV
Built 1986
HOLL0WAY (FAS 497A over PAINTER CREEK
Built 1994
Bridge Details
- Structure #
- 092020700000000
- Year Built
- 2013
- Length
- 89.2 m (292.7 ft)
- Max Span
- 24.4 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,350
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.