FAS 331(CH 10) over SALT FORK

2.25 MI S OAKWOOD · County 183, Illinois · Built 1980 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
092017700000000
Year Built
1980
Length
121.6 m (399 ft)
Max Span
49.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$795,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.