IL 1 (FAP 332) over CREEK

2 MI S OF HOOPESTON · County 183, Illinois · Built 1940 · 2 Lanes · 4,550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
092003200000000
Year Built
1940
Length
17.5 m (57.4 ft)
Max Span
15.9 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
4,550
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.