TR 79A over TRIB TO CLEAR CREEK

2 MI W OF COBDEN · County 181, Illinois · Built 1993 · 2 Lanes · 175 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
091319400000000
Year Built
1993
Length
18.8 m (61.7 ft)
Max Span
18 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
175
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.