CH 3 over MILL CREEK

0.14M.E OF ILL 127 · County 181, Illinois · Built 1972 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
091311100000000
Year Built
1972
Length
35.1 m (115.2 ft)
Max Span
11.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.