FAI 57 SB over ILL 146

OVER ILL 146 · County 181, Illinois · Built 1958 · 2 Lanes · 5,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
091001200000000
Year Built
1958
Reconstructed
2017
Length
41.8 m (137.1 ft)
Max Span
15.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
5,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$396,000
Total Project Cost
$594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.