PINECREST DR. over I-74

PINECREST DR. · County 179, Illinois · Built 2021 · 3 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
090018100000000
Year Built
2021
Length
65.3 m (214.2 ft)
Max Span
32.1 m
Width
23.1 m (75.8 ft)
Lanes
3
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.