EB US 150 over ILLINOIS RIVER & T&P RR

NE END OF PEORIA · County 179, Illinois · Built 1948 · 2 Lanes · 30,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
090007000000000
Year Built
1948
Reconstructed
2000
Length
1430.2 m (4692.3 ft)
Max Span
163.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
30,000
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,541,000
Total Project Cost
$12,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.