E MCCONELL RD over CEDAR CREEK

0.3 mi N of DAKOTA RD · County 177, Illinois · Built 2022 · 2 Lanes · 900 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
089515000000000
Year Built
2022
Length
13.8 m (45.3 ft)
Max Span
4.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.