CH 3 (FAS 373) over MUD CREEK
CTR-25-T12NR6E · County 175, Illinois · Built 1940 · 2 Lanes · 75 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.996144, -89.763975
This bridge is in worse condition than 60.2% of bridges in County 175. The average bridge in Illinois is 0 years old; this one is 86 years old.
Nearby Bridges
ILL 91 over MUD RUN CR
Built 2000
ILL 91 over CAMP RUN CREEK
Built 1984
FAS 1378-CH 10 over SPOON RIVER
Built 1977
IL 91 over PRINCE RUN TRIB
Built 2000
COUNTY LINE RD-TR over PRINCE RUN CREEK
Built 1975
FAS 1378-CH 7 over SPOON RIVER
Built 1968
TR 114 over MUD RUN
Built 1984
TR 116 over CAMP CREEK
Built 2000
TR 151 over CAMP RUN
Built 1980
TR 3 (PEORIA CO.) over SPOON RIVER
Built 1992
Bridge Details
- Structure #
- 088310300000000
- Year Built
- 1940
- Length
- 35.7 m (117.1 ft)
- Max Span
- 13.4 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $219,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.