TR 176 over SWAFFORD CREEK

3.0 MI SW SHELBYVILL · County 173, Illinois · Built 2021 · 1 Lanes · 225 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
087359400000000
Year Built
2021
Length
21.3 m (69.9 ft)
Max Span
19.2 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
225
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.