FAS 713(CH 15) over SECTION CREEK TRIB

1.75 MI N HERRICK · County 173, Illinois · Built 1985 · 2 Lanes · 550 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
087342500000000
Year Built
1985
Length
7.1 m (23.3 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
550
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.