TR 285 over OPPOSUM CREEK

3 MI NW OF OCONEE · County 173, Illinois · Built 1969 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
087327900000000
Year Built
1969
Length
12.3 m (40.4 ft)
Max Span
11.9 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$296,000
Total Project Cost
$330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.