TR 100 (9.5W) over SPRING CREEK
4.0 E BERLIN · County 167, Illinois · Built 1970 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.772217, -89.828664
This bridge is in worse condition than 94.2% of bridges in County 167. The average bridge in Illinois is 0 years old; this one is 56 years old.
Nearby Bridges
TR 104 over SPRING CREEK
Built 1993
FAS613-CH 8 over BRANCH SPRING CREEK
Built 1985
CH-15 over LITTLE SPRING CR
Built 2008
TR 104 (9W) over SPRING CREEK
Built 1970
TR 90 (11W) over SPRING CREEK
Built 1958
I-72 / US 36 over LITTLE SPRING CREEK
Built 1975
FARMINGDALE RD/CH over I-72 / US 36
Built 1974
FAS 622/CH 15 over SPRING CREEK
Built 1994
TR 72 (11W) over SPRING CREEK
Built 1972
TOLLIVER/BATES RD over I-72 / US 36
Built 1974
Bridge Details
- Structure #
- 084308600000000
- Year Built
- 1970
- Length
- 26.8 m (87.9 ft)
- Max Span
- 9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $109,000
- Total Project Cost
- $164,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.