OLD US 36 over 7TH ST. RAMP (NB)

S EDGE RIVERTON · County 167, Illinois · Built 1958 · 2 Lanes · 2,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
084005300000000
Year Built
1958
Reconstructed
2006
Length
39.5 m (129.6 ft)
Max Span
14 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
2,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.