TR 126A over LONG BRANCH

1 MI S HAMILTON CO · County 165, Illinois · Built 2007 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
083322900000000
Year Built
2007
Length
15.7 m (51.5 ft)
Max Span
14.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.