CH 34 over M FORK SALINE RIVER

1 MI S OF GALATIA · County 165, Illinois · Built 1990 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
083318700000000
Year Built
1990
Length
30.9 m (101.4 ft)
Max Span
12.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.