CH 16 over S FORK SALINE RIVER

3 MI S CARRIER MILLS · County 165, Illinois · Built 1980 · 2 Lanes · 375 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
083314500000000
Year Built
1980
Length
59.7 m (195.9 ft)
Max Span
19.5 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
375
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.