FAP 332-US 45 (NB) over STREAM

1 MI SW ELDORADO · County 165, Illinois · Built 2002 · 2 Lanes · 9,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
083005500000000
Year Built
2002
Length
15.8 m (51.8 ft)
Max Span
14.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
9,550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.