PARK ACCESS ROAD over WHISPERING WILLOW LK
FRANK HOLTEN ST. PK. · County 163, Illinois · Built 2004 · 2 Lanes · 350 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.598783, -90.099647
This bridge is in worse condition than 19% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 22 years old.
Nearby Bridges
PARK ROAD TR 515A over I255 & HARDING DITCH
Built 1981
LAKE DRIVE over DRAINGE TO FHSP LAKE
Built 1929
LAKE DR/ FAU 9185 over FAI 255/HARDING DTCH
Built 1981
POCKET RD/ FAU 923 over FAI 255
Built 1981
FAI 255 over STATE ST
Built 1982
LAKE DR FAU 9185 over A&S RR AND 43RD ST
Built 1976
STATE STREET over ALTON/SOUTH RR
Built 1999
STATE ST/ FAU 9182 over HARDING DITCH
Built 1981
FAI 255 over SUMMIT AVE
Built 1982
I-255 NB over St. Clair Ave & Metrolin
Built 1982
Bridge Details
- Structure #
- 082906000000000
- Year Built
- 2004
- Length
- 19.8 m (65 ft)
- Max Span
- 19.4 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Park, Forest, or Reservation Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.