QUIRIN RD/TR 84 over WEST FORK CREEK

3 MI SW SMITHTON · County 163, Illinois · Built 1983 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
082410900000000
Year Built
1983
Length
47.2 m (154.9 ft)
Max Span
16.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.