WERNER RD/ FAU 925 over SOUTHERN RR
0.3 MI E 74 ST · County 163, Illinois · Built 1960 · 2 Lanes · 525 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
2
Critical
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 2 | Critical |
| Substructure | 2 | Critical |
Location
38.553986, -90.049628
This bridge is in worse condition than 99% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 66 years old.
Nearby Bridges
74TH ST/ FAU 9253 over SO RR 5 W BELLEVILLE
Built 1955
ILL 13 WB over Ramp from EB IL 15
Built 1959
ILL 13 over ILL 15
Built 1959
Ramp to IL 13 EB over ILL 15 WB
Built 1957
IL 161 over Schoenberger Creek
Built 1993
IL 161 NB over DutchHollow Metrolink cr
Built 1992
IL 161 SB over DutchHollow Metrolink cr
Built 1992
IL 15 over NSRR ICRR
Built 1940
FRANK SCOTT PKWY W over METROLINK
Built 2001
MS-6302 Dutch Hw R over Creek
Built 2016
Bridge Details
- Structure #
- 082402300000000
- Year Built
- 1960
- Length
- 29.3 m (96.1 ft)
- Max Span
- 9.8 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 525
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $472,320,000
- Total Project Cost
- $486,720,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.