Rieder Road TR 222 over FAI 64
1.64 MI E OF ILL 158 · County 163, Illinois · Built 2017 · 4 Lanes · 1,550 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.565678, -89.847928
This bridge is in worse condition than 19% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 9 years old.
Nearby Bridges
FAI 64 WB over SILVER CREEK
Built 1971
FAI 64 EB over SILVER CREEK
Built 1971
GRAY PLAZA over TRIBUTARY SILVER CREEK
Built 1970
PRYOR DRIVE over TRIBUTARY SILVER CREEK
Built 2010
FAI 64 WB over LITTLE SILVER CREEK
Built 1971
FAI 64 EB over LITTLE SILVER CREEK
Built 1971
ILL 158 SB over FAI 64
Built 1973
ILL 158 NB over FAI 64
Built 1973
US 50 over CSXRR
Built 1989
US 50 over SILVER CK OVFL
Built 1918
Bridge Details
- Structure #
- 082028500000000
- Year Built
- 2017
- Length
- 66.4 m (217.8 ft)
- Max Span
- 32.7 m
- Width
- 30.2 m (99.1 ft)
- Lanes
- 4
- Daily Traffic
- 1,550
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.